|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2024 年 12 月 25 日,在中央邦克久拉霍举行的一次活动中,总理纳伦德拉·莫迪为 Ken-Betwa 国家河流连接项目奠基,为 Omkareshwar 浮动太阳能项目揭幕,并为 1,100 多个 Atal Gram Sushasan Bhawan 举行了 Bhoomi Pujan 仪式。
Prime Minister Narendra Modi laid the foundation stone of the Ken-Betwa National River Linking Project at a function in Khajuraho, Madhya Pradesh on 25 December 2024 to mark the 100th birth anniversary of former Prime Minister Atal Bihari Vajpayee.
2024 年 12 月 25 日,纳伦德拉·莫迪总理在中央邦克久拉霍的一次活动中为肯-贝特瓦国家河流连接项目奠基,以纪念前总理阿塔尔·比哈里·瓦杰帕伊诞辰 100 周年。
The Prime Minister also inaugurated the Omkareshwar Floating Solar Project and performed the Bhoomi Pujan of over 1,100 Atal Gram Sushasan Bhawans at the function.
总理还为 Omkareshwar 浮动太阳能项目揭幕,并在仪式上为 1,100 多个 Atal Gram Sushasan Bhawan 表演了 Bhoomi Pujan。
The function was attended by Mangubhai Patel, Governor of Madhya Pradesh, Dr Mohan Yadav, Chief Minister of Madhya Pradesh and CR Patel, Union Jal Shakti Minister.
中央邦州长 Mangubhai Patel、中央邦首席部长 Mohan Yadav 博士和 Union Jal Shakti 部长 CR Patel 出席了此次活动。
The Ken-Betwa national river interlinking project is the first of the 30 rivers to be interlinked under the central government’s ‘Interlinking of Rivers under the National Perspective Plan’.
肯-贝特瓦国家河流互联工程是中央政府“国家远景计划下河流互联”的 30 条河流中的第一个。
The plan proposes to interlink 30 rivers -16 Peninsular and 14 Himalayan rivers ,so as to transfer the surplus water of a river to a water deficit river. It is expected to solve the problem of flooding, drought and provide assured drinking water and irrigation facilities,
该规划提出将30条河流-16条半岛河流和14条喜马拉雅河流进行互联,将一条河流的富余水量输送到缺水河流。有望解决洪涝、干旱问题,提供放心饮水和灌溉设施,
The project is being implemented by the National Water Development Agency under the Union Ministry of Jalshakti.
该项目由贾尔沙克蒂联邦部下属的国家水开发局实施。
The Central government and the state governments of Uttar Pradesh and Madhya Pradesh signed a memorandum of understanding (MoU) on March 22, 2021 for the implementation of Ken-Betwa link national Project.
中央政府与北方邦和中央邦的邦政府于 2021 年 3 月 22 日签署了实施肯-贝特瓦连接国家项目的谅解备忘录 (MoU)。
To implement the project a Special Purpose Vehicle (SPV) called Ken-Betwa Link Project Authority (KALPA) has been set up.
为了实施该项目,成立了一个名为 Ken-Betwa Link 项目管理局 (KALPA) 的特殊目的机构 (SPV)。
The project seeks to transfer surplus water from Ken river to Betwa through the construction of Daudhan Dam and a canal linking the two rivers, the Lower Orr Project, Kotha Barrage -and Bina Complex Multipurpose Project.
该项目旨在通过建设 Daudhan 大坝和一条连接两条河流的运河、下奥尔项目、Kotha Barrage 和 Bina Complex 多用途项目,将剩余的水从 Ken 河转移到 Betwa。
It will generate 103 MW of hydel power and 27 MW of solar power.
它将产生 103 兆瓦的水力发电和 27 兆瓦的太阳能发电。
The Project will be developed in two phases.
该项目将分两期开发。
Under Phase-I, Daudhan Dam will be constructed on the Ken river in Chhatarpur district of Madhya Pradesh and the Lower Orr Project will be constructed on the Betwa river in Jhansi district of Uttar Pradesh at a cost of Rs 4,398 crore.
一期工程中,Daudhan 大坝将建在中央邦恰塔尔普尔地区的肯河上,下奥尔项目将建在北方邦占西地区的贝特瓦河上,耗资 439.8 亿卢比。
Phase-II will involve the construction of the Kotha Barrage on the Betwa river in Hamirpur district of Uttar Pradesh and the Bina Complex Multipurpose Project on the Bina river in Sagar district of Madhya Pradesh at a cost of Rs 3,523 crore.
二期工程将包括建设北方邦哈米尔布尔地区贝特瓦河上的科塔拦河坝和中央邦萨加尔地区比纳河上的比纳综合体多功能项目,耗资352.3亿卢比。
The project will provide irrigation benefits to 6.35 lakh hectares of land in Madhya Pradesh and Uttar Pradesh.
该项目将为中央邦和北方邦的 63.5 万公顷土地提供灌溉效益。
The project will also provide drinking water benefits to 41.10 lakh people in Madhya Pradesh and 21.30 lakh people in Uttar Pradesh.
该项目还将为中央邦的 411 万人和北方邦的 213 万人提供饮用水。
The 90 MW Omkareshwar floating solar project was commissioned by the SJVN Limited in August 2024. It was officially inaugurated by Prime Minister Modi on 25 December 2024.
90兆瓦的Omkareshwar浮动太阳能项目于2024年8月由SJVN Limited委托运营。该项目于2024年12月25日由莫迪总理正式揭幕。
The Omkareshwar Floating Solar Project is built on River Narmada and is located in the Khandwa District of Madhya Pradesh.
Omkareshwar 浮动太阳能项目建于纳尔马达河畔,位于中央邦坎德瓦区。
The Omkareshwar Floating Solar Project is in the largest floating solar park of India, the Omkareshwar Floating Solar Park.
Omkareshwar浮动太阳能项目位于印度最大的浮动太阳能公园Omkareshwar浮动太阳能公园。
免责声明:info@kdj.com
The information provided is not trading advice. kdj.com does not assume any responsibility for any investments made based on the information provided in this article. Cryptocurrencies are highly volatile and it is highly recommended that you invest with caution after thorough research!
If you believe that the content used on this website infringes your copyright, please contact us immediately (info@kdj.com) and we will delete it promptly.
-
- 分析师表示,随着比特币主导地位的减弱,山寨币季节已经到来
- 2024-12-26 09:10:02
- 随着比特币的交易价格继续低于 10 万美元的里程碑,加密货币市场的焦点正在转向山寨币。