bitcoin
bitcoin

$98162.254345 USD

4.01%

ethereum
ethereum

$3490.967290 USD

2.18%

tether
tether

$0.999206 USD

0.06%

xrp
xrp

$2.300272 USD

2.24%

bnb
bnb

$704.204551 USD

1.69%

solana
solana

$199.697540 USD

4.31%

dogecoin
dogecoin

$0.333431 USD

3.11%

usd-coin
usd-coin

$0.999971 USD

0.00%

cardano
cardano

$0.927297 USD

1.95%

tron
tron

$0.257327 USD

1.96%

avalanche
avalanche

$41.199338 USD

5.77%

chainlink
chainlink

$24.839317 USD

2.71%

toncoin
toncoin

$5.843756 USD

3.77%

shiba-inu
shiba-inu

$0.000023 USD

3.12%

sui
sui

$4.596411 USD

-1.67%

加密貨幣新聞文章

莫迪總理將於週三為克久拉霍肯-貝特瓦河連接計畫奠基

2024/12/25 01:48

該項目將惠及10個地區,包括Chhatarpur、Niwari、Damoh、Shivpuri、Datia、Raisen、Vidisha和Sagar。

莫迪總理將於週三為克久拉霍肯-貝特瓦河連接計畫奠基

Prime Minister Narendra Modi will lay the foundation stone for the Ken-Betwa river link project in Khajuraho on Wednesday. He will also dedicate the floating solar project of Omkareshwar and lay the foundation stone for 1,153 Atal Gram Sushashan Bhawan.

週三,印度總理莫迪將為克久拉霍肯-貝特瓦河連接計畫奠基。他還將致力於 Omkareshwar 浮動太陽能項目,並為 1,153 Atal Gram Sushashan Bhawan 奠定基礎。

The PM will arrive at Khajuraho at 12.10 pm and will return to Delhi by 2.20 pm. He will also issue a stamp and a coin in memory of former prime minister Atal Bihari Vajpayee.

總理將於中午 12 點 10 分抵達克久拉霍,並於下午 2 點 20 分返回德里。他還將發行一枚郵票和一枚硬幣,以紀念前總理阿塔爾·比哈里·瓦杰帕伊。

Governor Mangubhai Patel, Chief Minister Mohan Yadav and Jal Shakti Minister CR Patil will also be present in the programme.

州長 Mangubhai Patel、首席部長 Mohan Yadav 和 Jal Shakti 部長 CR Patil 也將出席活動。

The Ken-Betwa river link project will benefit 10 districts, including Chhatarpur, Niwari, Damoh, Shivpuri, Datia, Raisen, Vidisha and Sagar. It will provide irrigation facilities to 11,000 hectares of land and benefit 44 lakh farmers. The irrigation facility will increase farmers’ income.

Ken-Betwa河流連接計畫將惠及10個地區,包括Chhatarpur、Niwari、Damoh、Shivpuri、Datia、Raisen、Vidisha和Sagar。它將為1.1萬公頃土地提供灌溉設施,使440萬農民受益。灌溉設施將增加農民收入。

Moreover, with the construction of hydel projects, 103 MW energy will be created. The river linking project will also provide irrigation facilities to 59,000 hectare land in Uttar Pradesh, including Mahoba, Jhansi, Lalitpur and Banda districts. Drinking water facility will be provided to 44 lakh people in Madhya Pradesh and 21 lakh in Uttar Pradesh.

此外,隨著海德爾計畫的建設,將產生103兆瓦的能源。該河流連接計畫還將為北方邦 59,000 公頃土地提供灌溉設施,包括馬霍巴、佔西、勒利特布爾和班達地區。將為中央邦的 440 萬人和北方邦的 210 萬人提供飲用水設施。

The floating solar project of Omkareshwar has a capacity of 600 MW. In the first phase of the project, electricity production commenced with full capacity from October.

Omkareshwar的浮動太陽能專案容量為600兆瓦。第一期工程從10月起滿載發電。

In the second phase, for 240 MW capacity, necessary permission is to be taken from the MPPACA and a later agreement will be signed with developer Satluj Jal Vidyut Nigam Limited.

第二階段的 240 兆瓦裝置容量將獲得 MPPACA 的必要許可,隨後將與開發商 Satluj Jal Vidyut Nigam Limited 簽署協議。

The Atal Gram Sushashan Bhawan will be constructed at a cost of Rs 1,153 crore. It will provide administrative facilities to 1,153 panchayats in the state.

Atal Gram Sushashan Bhawan 的建造成本為 115.3 億盧比。它將為該州 1,153 個panchayat 提供行政設施。

The PM will also lay the foundation stone for the construction of 100 houses under Pradhan Mantri Awas Yojana (PMAY) and will also interact with the beneficiaries.

總理也將為 Pradhan Mantri Awas Yojana (PMAY) 計畫下的 100 棟房屋的建造奠基,並將與受益者互動。

免責聲明:info@kdj.com

The information provided is not trading advice. kdj.com does not assume any responsibility for any investments made based on the information provided in this article. Cryptocurrencies are highly volatile and it is highly recommended that you invest with caution after thorough research!

If you believe that the content used on this website infringes your copyright, please contact us immediately (info@kdj.com) and we will delete it promptly.

2024年12月25日 其他文章發表於